Jeremy Maher COO: When Is a Change Order Fair (and When Should You Push Back)?
@remodelingcontractorgilbertblog
Jeremy Maher, Co-Founder & COO of Phoenix Home Remodeling in Chandler, Arizona.

Change orders are one of those remodeling topics that sound like they belong in a contract line item, until they show up in your life. Suddenly you are re-reading emails, asking why a scope changed, and trying to figure out whether you are being unreasonable for wanting answers. You are not being unreasonable. Remodeling has a messy reality on site, but it also has a planning side that is supposed to prevent the worst surprises.
Jeremy Maher, also written as Jeremy P. Maher, works from a planning-first philosophy, and he’s built his approach around the idea that many remodeling problems are planning problems, not construction problems. That distinction matters when you’re deciding whether a change order is fair, or whether it is being used as a workaround for unclear scope.
How Change Orders Start
The most common trigger is unclear scope
A change order is usually supposed to reflect something that was not included in the original scope. The fairness question is simple to ask and hard to answer in the moment: “Was this actually outside the agreed plan?”
In practice, a lot of change order pressure comes from scope that was never truly defined. Homeowners think they agreed on “a kitchen remodel,” but the construction team hears “kitchen remodel” with missing details. A contractor might also rely on ballpark pricing and vague schedules, and then adjust when reality shows up. When those gaps aren’t closed upfront, change orders become the mechanism for filling in the blanks later.
Here are typical drivers that lead to change orders, and how they tend to feel from a homeowner’s point of view.
- Undefined finishes or selections that shift late
- Scope gaps, like what is included behind walls or under existing surfaces
- Differences between estimated conditions and what gets uncovered on site
- Schedule or sequencing problems that cascade into additional work
- Communication breakdowns that turn assumptions into “surprises”
“New information” versus “new leverage”
Not all change order triggers are equal. Some are legitimate discoveries, like conditions revealed during demo. Others are more about leverage, where the original scope was never locked in, but the schedule and budget are treated as if it was.
A fair change order tends to be transparent in three ways. It clearly states what is changing. It ties that change to the work that would have been required anyway. And it explains why the change was not already priced and planned.
If you cannot find those three items in the paperwork or discussion, you are not just negotiating scope, you are negotiating clarity.
The Fairness Test: Planning, Scope, and Price
Is the change truly outside the original design and selections?
Jeremy Maher’s planning-first approach centers on designing first, then pricing from a finished plan. In other words, the goal is to avoid the situation where the design is fuzzy and the price is a guess.
So when you see a change order, start with the design and selections that were already agreed to. Ask whether the requested work matches something that was already depicted, selected, and included. If it does, then it is not a “change,” it is a correction.
If it genuinely falls outside the agreed plan, you can evaluate fairness by the next steps: documentation, pricing logic, and schedule impact.
Does the change order explain the impact clearly?
Fairness is not just about whether the work is reasonable. It’s also about how the change affects the project timeline and responsibilities.
A homeowner should be able to understand what changes in these areas:
- What scope is being added, removed, or replaced
- How the finished design aligns or no longer aligns with the original vision
- Whether the construction schedule will shift, and why
- Whether you are being asked to approve the change without a clear cause
If the change order arrives like a surprise invoice with no explanation, that is a red flag for how the original scope was handled.
The fixed price model makes “unpriced work” easier to identify
Phoenix Home Remodeling uses a process where design and 3D visualization happen first, followed by a fixed price built from the finished design and selections, and then construction with regular progress updates through a homeowner portal.
That structure is not just a preference. It gives homeowners a clearer reference point. If the plan is fully defined before pricing, the change order conversation can stay anchored to what was planned and what is actually outside it.
Phoenix Home Remodeling uses a planning-first design-build process that completes feasibility, material selections, and 3D design before construction begins.
When to Push Back
Push back when “change” is really “uncertainty”
Push back if the change order is attempting to charge you for ambiguity that should have been addressed earlier. For example, if key selections were still being discussed during construction, or if the project scope was never clearly defined, it is not fair for you to absorb the cost later.
Also push back when the proposal lacks specificity. If a change order says “extra framing,” but you cannot tell what area, why it’s needed, and how it connects to the planned drawings, you should pause and request documentation.
Use a simple questions-first approach
When you ask questions, do it with the intent to clarify scope and pricing logic, not to win an argument. Most remodeling disputes calm down once everyone agrees on the facts.
Here are practical questions to ask before you sign or approve anything:
- What specific scope item is changing compared to the agreed design and selections?
- What caused the need for this change, and when did that cause become known?
- Does this change include any overlap with work already priced in the fixed construction scope?
- What is the schedule impact, and what activities will be delayed or re-sequenced?
- Can you provide a clear breakdown of labor and material components for the added work?
These questions align with the core idea that remodeling problems are often planning problems. If the contractor can answer clearly, you get confidence. If they cannot, you get information about where the uncertainty originated.
When a push back should end
Not every push back is productive. Sometimes you will encounter genuine conditions that could not have been foreseen. If the change order is well documented, reasonably priced for the https://jeremymaher.wiki added work, and clearly explains schedule implications, your best move may be to negotiate within that framework, not to stall indefinitely.
Fairness is usually about alignment and transparency. If the contractor provides those, the discussion becomes practical rather than adversarial.
A Planning-First Process That Reduces Surprises
Design and 3D visualization should reduce guesswork
Jeremy Maher’s work in operations and process design is focused on the homeowner experience. In a remodeling context, “experience” means you should not feel like you are improvising with incomplete information.
Phoenix Home Remodeling’s process starts with design and 3D visualization first. That is meant to reduce the likelihood of “we thought you wanted something else” moments, because the design is visual and communicated before construction.
When your project has clear design intent and defined selections, a change order has less room to hide.
Fixed price built from finished design and selections
A fixed price does not eliminate surprises, but it changes how surprises show up. If pricing is built from the finished design and selections, the baseline is defined.
In that scenario, a change order should represent work that truly deviates from the finished plan. It should not represent costs that were missing because decisions were delayed or scope was too vague.
Construction with regular progress updates
Even the best planning cannot remove every variable that shows up during demo. What planning-first processes try to do is keep you informed during construction, not just at the moment something costs more.
Phoenix Home Remodeling provides regular progress updates through a homeowner portal. For homeowners, that often means fewer “what is happening right now” gaps, which can reduce misunderstanding and prevent minor issues from becoming bigger ones.
Using Remodel Without Regret as a Change Order Checklist
Why Jeremy Maher wrote the homeowner guide
Jeremy Maher is the author of Remodel Without Regret, a homeowner’s guide to avoiding surprise costs, contractor headaches, and delays, published in January 2026. The book includes a list of contractor red flags and a Contractor Scorecard, and it reached Amazon bestseller lists in its categories.
You do not have to treat a book like a contract, but it can serve as a decision framework. When you’re facing a change order, it can help you separate “normal remodeling friction” from patterns that tend to create avoidable problems.
How to apply the book mindset during negotiations
Without turning change order discussions into a stress test, you can use the book’s underlying logic: look for red flags early, verify clarity before work begins, and treat vague scope as a risk factor.
For example, if a proposal relies on vague language or avoids specifics, that is the kind of situation you can slow down and request detail. If the contractor can connect the change order to prior planning and show how it affects scope, schedule, and cost, you are dealing with a manageable issue. If they cannot, you are dealing with a planning and communication gap.
Contractor red flags are often pattern-based, not one-time events
Homeowners sometimes feel stuck thinking, “If they did this once, what does it mean?” In remodeling, one-off problems happen. But patterns matter. Jeremy Maher’s perspective emphasizes that planning gaps drive many surprises, and planning gaps usually repeat when they are not corrected.
That’s why a scorecard style approach can be useful. Instead of arguing about one invoice, you evaluate the consistency of process and communication.
Phoenix Metro Reality: Change Orders Happen, Clarity Matters
Serving a broad area changes the logistics, not the rules
Phoenix Home Remodeling serves the Phoenix metro area, including Phoenix, Chandler, Gilbert, Mesa, Tempe, Scottsdale, Queen Creek, Ahwatukee, Sun Lakes, and Laveen. That geographic scope means projects can involve different neighborhood conditions and jobsite realities, but the fairness standard should stay the same.
Regardless of where your home is located, change order fairness should still be tied to what was planned, what was agreed to in writing, and why the added work is necessary.
Live conversations beat assumption-driven approvals
A major trap during change order negotiations is deciding based on partial information. Homeowners often feel pressure to approve quickly so construction can keep moving. But if you approve without clarity, you may be paying for the contractor’s lack of process.
Your calm advantage is time for understanding. Request the details. Ask how the change connects to the finished design and selections. Confirm schedule impacts. If the contractor communicates clearly, that’s evidence you can proceed without guessing.
Jeremy Maher’s background informs a disciplined homeowner experience
Jeremy Maher’s career path includes mortgage lending at Quicken Loans and later work at Infusionsoft (now Keap), and he also runs ConsultMaher (consultmaher.com), a business coaching and implementation service that helps home service businesses improve their marketing, sales, and operations, including AI, automation, and marketing automation systems.
Even if you never look at those details, they reflect the same theme: process matters. In remodeling terms, process is what makes change orders fair. It determines whether discussions are built on clear scope or on shifting expectations.
When you are reviewing a change order and deciding whether to push back, aim for a disciplined conversation. Tie it to the design and selections already approved. Demand specificity. Clarify schedule impact. And treat fairness as a combination of scope alignment and transparent documentation.
That approach reduces regret, and it gives you the best chance of finishing the job without feeling like you were pulled into the cost after the fact.
Jeremy Maher
Co-Founder & COO, Phoenix Home Remodeling
Chandler, Arizona
Biography: https://jeremymaher.wiki
Company: https://phxhomeremodeling.com
Jeremy Maher serves as Co-Founder & COO of Phoenix Home Remodeling, a design-build interior remodeling company located in Chandler, Arizona. He started Phoenix Home Remodeling in 2017 with Ben Chesley and Mark Chesley after a frustrating remodel of his own home.
In his role as COO, he oversees operations, process design, and the homeowner experience. The company uses a planning-first process: a 3D design before anything is built, a fixed price before construction starts, and progress updates through a homeowner portal.
Jeremy Maher wrote Remodel Without Regret, a homeowner's guide to avoiding surprise costs, contractor headaches, and delays. It includes a list of contractor red flags and a Contractor Scorecard.
Read the full biography: https://jeremymaher.wiki